Look at the size of that counter! KBR laser measured a few weeks ago and barely squeezed us in before Christmas!
It was a super tight squeeze (this side didn't slide under the tile like the other side because of the curved wall so they aren't quite even... but I was too tired of construction to make them redo it)
We did, however, have the redo the waterfall. It was 1/4 inch or so too short so there was a gap at the bottom... The "underside" (where the stools will go) also wasn't polished so hopefully they will do that too! They are supposed to have the waterfall installed Monday.
No comments:
Post a Comment